01 Identity lock
Write methanol, CAS 67-56-1 if that is the intended identity, and the named grade. If fuel, AA and industrial grades are still competing, keep three lines instead of one blended description.
FREE sourcing support for qualified business buyers, with an eligible benefit of up to 3%. Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.
Planner desk for methanol bulk RFQs
Use this planner before you send an inquiry. It turns methanol bulk into a checklist of grade, water content, package, destination, SDS/TDS/CoA and who still has to sign. It is not a carbon or ESG scorecard, not a forest scene, and not a claim that a factory is already booked.
The planner does not create a new backend field. Everything still posts through the connected form as name, company, email, phone and content. Optional budget currency and high-end, mid-range, budget or undecided preference merge at submit time if JavaScript is on.
Close these bulk questions before price
Write methanol, CAS 67-56-1 if that is the intended identity, and the named grade. If fuel, AA and industrial grades are still competing, keep three lines instead of one blended description.
Assay, water content, density, flash point, acidity, ethanol, acetone and trace metals stay blank unless a reviewer owns them. A filled cell without an owner is a false acceptance criterion.
Choose drum, IBC, ISO tank or methanol bulk only after site equipment is known. Net kilograms per package must be stated before unit price is compared. Tank-truck windows remain supplier statements.
SDS, TDS and CoA format are requested for the quoted product. A sample, if any, needs a named test, a reviewer and a pass or fail rule. This planner does not run the lab.
Trade-off to keep visible: a methanol bulk ISO tank can reduce drum handling, but only if UN 1230 classification, carrier booking and receiving piping are confirmed. Drums can be the slower but clearer path when the site cannot take bulk. We record both until the buyer signs.
Human sign-off still required here
Paste the checklist, including blanks
Paste open cells into the requirement box. Do not delete blanks; factories should see what is still undecided.